|
KARL
WAINWRIGHT
is a time served Superintendent who has achieved City
and Guilds in his chosen field and has subsequently gained a
wealth of practical experience in the field whilst
working on various Petro-Chemical sites including:
Shell
UK, ICI (Product and Research), Brunner Mond,
Zeneca, Shotton and Bridgewater paper mills, Glaxo,
Genzin Fine Chemicals, Proctor & Gamble etc.
He has in excess of 26 year's solid experience in the
fabrication, welding and installation of piping systems. He has full
and extensive knowledge of General Assembly, Process &Instrument Design and Isometric drawings for the
shop and site fabrication and installation in Petro-Chemical
and Pharmaceutical Industries. His experience
has also included the fabrication / installation and welding of
Orbital Hygienic tubing systems as required
within the Pharmaceutical industry to the rigid standards of
cleanliness specified
He has held the position of Construction / Commissioning
Engineer whilst working on the Kodak Eastman Project in Haicang
Xiamen, China, Working jointly with East Asia's
largest Hygienic Tube fabrication / welding and
installation company (Beijing Yanda.) The initial contract was for
the fabrication of some 1950 isometrics consisting of 13,500 orbital
welds, (at project completion the weld figure
was at 19000+) Part of his discipline was to maintain continuity of
production and installation to achieve the extremely high standard
system that was required by the client.
He has gained an extensive knowledge of
Mechanical Maintenance programmes based on the requirements of ISO
9002.
He is able to communicate at all levels and is of a
personable nature and is well liked by all who work with him.
Additionally he is self-motivated and is able to motivate
others.
Karl has recently occupied the roll
of Project Manager on the Kharfi International, 255 Man Camp
Project in Basrah, Iraq. He was responsible
all of the piping
systems. Duties include, contract activity co-ordination between
main piping fabrication sub-contractors to ensure that the Engineers
and sub-contractors complete the system and sub-system packages in
conformance with specifications and to schedule
and within budget. The generation of work to go lists. Additional duties include
the Lock out and tag out nominated authority for the areas of
work in accord with all other disciplines and
site safety group to ensure safe working practices are observed at all
times |