Resume II
|
|
www.karlwainwright.com
|
PCI Membrane Systems. Jining
Shan-Dong Province, China.
http://ourworld.compuserve.com/homepages/PCIMS/ |
|
June 2000 - August 2000, Piping
Superintendent.
|
|
As the representative PCI
Membranes on site, duties included the overall supervision of the piping
systems installation, punch listing, pre-commissioning and resolving
technical queries that were raised by the Client with regard to the
membrane water treatment systems.
|
|
Fluor Daniel PRL
Limited. Eastman-Kodak
Project, Haicang, Xiamen, China.
www.fluor.com ;
http://www.kodak.com/CN/en/nav/aboutKodak/xiamen.shtml |
|
July 1999 - May 2000, Piping / Commissioning
Engineer.
|
|
Supervision
of local labour during the fabrication, installation of High purity of
piping systems involving Orbital and on-site welding of 15, 49 and
60-degree High purity water systems to ensure that the correct WPS were
followed and that the oxygen levels within the gas purge were maintained
within the specified tolerances. Responsible for supervising the
Hydro-testing of the High purity systems utilizing deminerialized water,
ensuring that the systems were clean and dry after test. Conduct 80% and
95% complete engineering walk downs' by Isometric and P & ID's on all
piping systems, jointly with construction and engineering. Mark up (red
line) P & ID's indicating changes, adjustments etc. and respond to
technical queries from construction. Follow the punch items through to
completion. Pre Commission Air Handling Units and utility systems for the
final handover and sign off to Kodak. This involved flushing systems clean, correcting any punch items
still outstanding and carrying out the final balancing of the systems for
startup.
|

|
|
Kodak, Xiamen,
China. |
|
|
M.S. AL-Suwaidi.
P.O. Box: 421, Yanbu Al Bahr, Kingdom of Saudi Arabia.
http://www.suwaidi.com/intro.html |
Sept 1997 - July 1999, Piping
Superintendent. |
|
Chyodia
Aromatics Project (SR 128,000,000) and Yanpet Expansion Project (SR 98,000,000) to IS0
9002. |
|
Responsibilities: Supervision of local labour
consisting of 400 Indian and Filipino men, on the Fire Heaters Pipe racks
and M.S.A.S. Fabrication Shop. Hydro testing and re-instatement of Cherry
package boiler and Callidus Technology Inc. Polymer Ground Flare
systems. Involved in the
conceptual and detailed design of the M.S.A.S. Spool Tracking System, this
novel system enabled the tractability of the spools from, material receipt
to handover to the client after Hydro Test and reinstatement. Responsible for the logistics' of
spool transfer for M.S.A.S. and the Sub-Contractor's Fabrication Shops to
the site.
N.O.C Available on
request |
|
O'Hare Limited.
Western House, Western Road, Runcorn, WA7 4HR
|

|
|
Yanpet, Yanbu Al Barh,
K.S.A
|
http://www.ohare.co.uk. |
|
Aug 1992 - Sep 1997 Mid-Cheshire Senior
Superintendent
|
|
Responsibilities: Managed boiler pressure vessel inspections
(P.V.I.) on Babcock Boilers in ICI Winnington to BS 5750 and ISO
9002Responsibilities included management of subcontractors in execution of
turnkey refurbishment and ultimate pressure test for insurance
purposes.
Management
of Ammonia Distiller and heater pressure vessel inspections and breakdown
maintenance.
Management
of manpower, equipment and materials in the refurbishment of the
equipment.
Management
of general maintenance and projects on all sites in the mid-Cheshire
area.
Sites
included: ICI Winnington (Chemical), ICI Lostock (Chlorine), Brunner Mond,
Winnington / Lostock (Ammonia) and Consolidated Bathurst (Paper
Mill) |
|